Showing posts with label contamination. Show all posts
Showing posts with label contamination. Show all posts

Monday, October 28, 2019

Cleaning up: An affordable housing milestone


A pair of street corners in southeast Seattle may not look like much right now, but they’re already a first-of-its-kind cleanup site for Ecology. Yet, it’s a contaminated site much like hundreds before it that have undergone cleanup and been put to new use. We’re opening a public comment period on a cleanup plan that marks an important an important step forward.  
A drawing of planned buildings, five stories on either side of an intersection.
The Maddux will provide affordable housing and street-level shops about a block from a Link light rail station.
Illustration courtesy of Mount Baker Housing Association.

A first

The Mount Baker Housing Association’s Maddux project is the inspiration for Washington’s Healthy Housing Remediation Program, which we developed in conjunction with the Washington State Department of Commerce. The program enables local governments and nonprofit organizations to obtain state funding to help offset environmental cleanup costs when redeveloping contaminated land for affordable housing.

Mount Baker acquired a cluster of lots where S. McClellan Street intersects with Martin Luther King Way S. The association plans 166 affordable units with street level retail a block from Sound Transit’s Mount Baker Link light rail station and near a variety of shopping and services.

Overcoming a common obstacle

These plans overlap with a costly problem that’s common to urban redevelopment. Previous use of the property – in this case a gas station and a dry cleaner – left contamination behind. The remediation program, building on earlier funding we’ve provided for the project’s cleanup, has enabled Mount Baker to proceed with more than $6 million in state assistance to hire consultants who evaluated the contamination, sifted through cleanup options and worked with us to propose a cleanup plan.

The former gas station at Martin Luther King and McClellan. The former dry cleaner is across McClellan at far left. Ecology photo.
We’re asking the public, as part of the state Model Toxic Control Act cleanup process, to review those studies, the plan, proposed updates to our legal agreement with Mount Baker, and environmental review documents we’ve prepared.

That comment period runs through November 26, 2019.

Historic releases from gas stations and dry cleaners are the most common types of cleanup sites in Washington. Current laws on handling cleaning chemicals and managing underground storage tanks prevent these problems at today’s cleaners and fill-up stations.

A cleanup plan that fits the project

The gas station cleanup will primarily involve excavation of soil in and around areas where underground tanks and system piping once were.

The dry cleaner’s contamination requires a more complex approach. The solvents that were used mix readily into water. Even a small spill or leak into the ground can spread over a wide area if it enters the flow of groundwater. That’s what happened here (see the map below), and the Maddux development will incorporate features that factor in a cleanup process that may continue for several years.

A map shows property parcels at the intersection of McClellan Street and Martin Luther King, Junior, Way. Shading shows areas at a former dry cleaner and at a former gas station where soil will be removed. Other shading shows the estimated location of groundwater that is contaminated with solvent chemicals.
The cleanup plan will protect people from contaminated
groundwater, shown in blue. Processes to break down
the plume’s solvents will proceed over several years.
Illustration courtesy of Mount Baker Housing Association.
Excavation of the contaminated soil under the dry cleaner and adjacent parcels will remove the source of the groundwater contamination. This will help slow or stop the expansion of the plume of solvent-contaminated groundwater that extends under S. McClellan Street, part of the former gas station and under an adjoining stretch of Martin Luther King Way S.

The rest of the plan allows the project to proceed and cleanup to continue without disrupting traffic on the two streets:
  • Because the solvent compounds can release vapor that can rise through the soil, the project will be engineered with capping, vapor barriers and sub-slab ventilation. The property deed will prohibit future modifications that change these protections without notifying us and obtaining our approval.
  • Long term monitoring will provide information on how well the cleanup treatments are working and track the breakdown of the solvents.
  • After 5 years of monitoring, the time to reach cleanup in the groundwater will be recalculated. If it is determined to be too slow, Mount Baker will inject a chemical (such as zero valent iron) into the groundwater that aids in the breakdown the contaminants. Bacteria that’s naturally present in soil also helps by feeding on the solvent chemicals, breaking them down biologically.

We will review the monitoring data and the condition of the site every five years to determine how well the plan is working and whether any changes are needed. We’ll issue a report on these periodic reviews and ask for public comment each time.

Two people operate a soil core sampling apparatus. On the left a person kneels, and on the right a person stands. Both hold parts of the equipment. Both are dressed in helmets and safety vests. They are inside a room with dry cleaning equipment.
Technicians for a consulting firm drill below the floor 
of a former dry cleaner to gather environmental samples.
Photo courtesy of Mount Baker Housing Association.

Public meeting

Along with the comment period, we’re hosting a public meeting and open house. Our cleanup experts will be there, along with representatives from Mount Baker and their environmental consultants. 

We’ll have displays about the project and the cleanup plan and will be glad to discuss the cleanup and answer questions. We’ll also give a presentation and take audience questions. Translation and interpreter services will be available in Spanish, Chinese, Vietnamese, and Khmer.

By: Larry Altose, Northwest regional communications manager

More information:

The documents out for comment:
A fact sheet about the project's cleanup process is available in Chinese, English, Khmer, Spanish and Vietnamese.

Other links:

Wednesday, September 4, 2019

How could our Brownfields program help your community?

Travel through a community of any size and you’re likely to see old gas stations, shuttered industrial facilities, or former farms – all of which may have environmental contamination. These abandoned or underutilized properties are known as brownfields. Our Brownfields Program helps put them back into use, allowing communities to bring their redevelopment visions to life.

Remediation realized

Ecology works with local governments, non-profits, tribes, and community stakeholders across Washington who are interested in cleaning up brownfields. We can help match your project to one or more of the wide range of federal and state funding and technical assistance opportunities.

Need inspiration to get your brownfield project going? Watch Palouse Mayor Michael Echanove share how his city partnered with Ecology and others to clean up the abandoned, contaminated Palouse Producers property on their main street:



Have a project of your own in mind? We invite you to join our Washington-Brownfields email list to receive updates about our efforts to support communities with redevelopment.

Learn more online

Following on the success of our 2019 Washington State Brownfields Conference, our updated brownfields website includes more information about funding opportunities, how to locate brownfield properties in your community, and access to print materials and presentations from the conference.

If you missed the conference, visit the Center for Creative Land Recycling blog, where they recapped the highlights in their “Brownfield Spotlight in Spokane” June 6 post. Big thanks to the Northwest Environmental Business Council and the U.S. Environmental Protection Agency, as well as to our sponsors, session presenters, and attendees for bringing your knowledge and interest to this important topic! We’ll use feedback received on the follow-up survey to plan future conferences and workshops.


Upcoming events

Tuesday, August 27, 2019

Tacoma Smelter Plume: Model Remedies Guidance gets an update

To encourage cleanup of soil contaminated by the former Asarco smelter in Tacoma, we've updated our Tacoma Smelter Plume Model Remedies Guidance. For almost 100 years, the Asarco Company operated a copper smelter in Tacoma. Air pollution from the smelter settled on the surface soil of more than 1,000 square miles of the Puget Sound basin. Arsenic, lead, and other heavy metals are still in the soil as a result of this pollution.

This guidance was created to encourage cleanup of Asarco contaminated soil during property development. It provides straightforward directions on soil sampling and cleanup of soil contaminated with arsenic and lead within the Tacoma Smelter Plume. In July, we launched a revised version of the guidance, replacing the older, 2012 version.

The guidance was written primarily for developers who build residential housing or commercial buildings. However, anyone who wants to sample and clean up their Asarco contaminated soil within the Tacoma Smelter Plume can use this guidance. The guidance streamlines the sampling and cleanup process and eliminates the need to develop separate sampling and cleanup plans. When developers use the remedies covered in this guidance to clean up their properties before building structures, Ecology is able to issue timely opinion letters stating that the cleanup meets state requirements.

Picture of smelter stack on hill, vegetation and tunnel entrance in foreground.
Former Asarco smelter stack.
In updating the guidance, we kept the same format, updated some information and links to resources, and added a new chapter. Some of the revisions answered and clarified frequently asked questions, such as calculating the minimum number of soil and duff samples needed. The new chapter describes sampling and remediation in natural areas, such as steep slopes, wetlands and their buffers.

Please, note that the publication number has changed from 12-09-086-A to 19-09-101.

If you have questions about the revised Tacoma Smelter Plume Model Remedies Guidance, contact our Technical Assistant, Eva Barber at 360-407-7094 or Eva.Barber@ecy.wa.gov.

Some internet web browsers store the address to the older version of the guidance in a cookie. If searching for the new guidance using Google or Google Chrome, you may need to clear the existing cookies and search again.

To download the new version of the guidance, go to:

To find out if you are within the Tacoma Smelter Plume, visit Ecology’s Dirt Alert Map.

By Crescent Calimpong, Toxics Cleanup Program



Monday, June 24, 2019

Cleaning up: In the footprint of an old corner gas station


One of the largest categories of cleanup sites, statewide, is former gas stations. Old-school underground storage tanks were prone to leaking into the surrounding soil. Tank owners today must follow laws and regulations to prevent leaks and spills. Many of the places once occupied by a corner gas station have since become desirable redevelopment locations. We're taking public comment and inviting you to a community meeting about one example that’s unfolding now in Seattle.

A line of shops with a few cars angle-parked in front.
A row of convenience shops at the station, toward the end
of its heyday.

First, some history

There was a gas station operating under the Texaco brand at Queen Anne Avenue North and Roy Street from 1927 to 1993. After the pumps closed, a deli operated on the property to 2018.

In 1986 Ecology responded to complaints of gasoline odors at the adjacent Monterey Apartments. An investigation we conducted from 1986 to 1990 revealed the gas station as the source. We installed two wells to remove petroleum from groundwater.

When the pumps closed and the underground tanks were removed in 1993, we found soil and groundwater contamination. We installed and operated a system from 1993 to 1997 to extract vapor and recover groundwater.

Texaco’s successor, Chevron Environmental Management Company (CEMC), upgraded and operated the system from 2003 to 2008 under Ecology’s Voluntary Cleanup Program. CEMC also mapped areas where low levels of contaminated groundwater extend into part of the surrounding neighborhood. Buildings over this plume and adjacent to the former gas station -- the Del Roy and Monterey apartments -- received vapor tests in 2009 that found indoor air quality within health thresholds. 

Aerial map with a yellow line surrounding about half a dozen properties.
Roystone on Queen Anne, LLC plans to clean up contamination at the former Texaco station. Chevron Environmental Management Co. will take steps needed for final cleanup of the entire site.

This corner’s about to change

Fast forward to 2019, and a developer named Roystone on Queen Anne, LLC has acquired the old gas station lot. The company plans to re-develop the vacant property into a multistory mixed-use building.

We’ve negotiated an agreement with both companies. Roystone will clean up contaminated soil and groundwater on its property to meet state cleanup standards in conjunction with excavation for its project. That cleanup is called an interim action.

Meanwhile, CEMC will proceed with the steps needed for final cleanup of the entire site. These include a site assessment, called a remedial investigation, a feasibility study of cleanup options, and a draft cleanup action plan.

What’s your take?

Closed retail store fronts, with an empty parking lot in the foreground, behind fabric-covered chain link fencing.
These empty shops will give way to cleanup work as part of re-developing
the site into a multi-story mixed-use building.
We’re inviting you to learn about these plans and tell us your thoughts about them. We’re taking comments through July 23, 2019 on the interim action plan, a legal agreement called an agreed order with the two companies, environmental reviews we’ve conducted, and a proposed public participation plan, which describes how we’ll work to inform people about the cleanup.

Our website has links to all of these documents, to our online public comment app for this site, and contacts for answers to questions. We’ve also placed copies of the documents at Seattle Public Library’s Queen Anne Branch, 400 W. Garfield St.

Pleased to see you

We’re hosting a public meeting to provide information, answer questions about the site and the cleanup process, and to take comments. The meeting will take place from 6 to 8 p.m., Thu., June 27, 2019 at the Maxwell Hotel, 300 Roy St. in Seattle.

Cleanup site information



By: Larry Altose, communications manager, Northwest Region

Tuesday, April 16, 2019

Register soon: Brownfields Conference room rate ending April 25

If you’re interested in learning about cleaning up and redeveloping properties with suspected or known contamination, please join us for the FREE Washington State Brownfields Conference in Spokane May 28 – 30, 2019. A block of rooms has been reserved at the Doubletree by Hilton Spokane City Center. The special room rate will be available until April 25, or until the group block is sold-out, whichever comes first. The guest list is growing and the cut off for getting the conference rate on hotel rooms is fast approaching, so register and reserve a room before it’s too late!

The goal of this conference is to bring together public and private sector stakeholders and tribes in Washington and the Inland Northwest. This event is being coordinated in partnership with the Northwest Environmental Business Council and is funded in part by the U.S. Environmental Protection Agency. We also want to thank the following event sponsors for their support:
  • GeoSearch
  • Hart Crowser
  • Maul Foster Alongi
  • PBS
  • Restorical Research
  • Spokane Environmental Solutions
  • Stantec
  • TSI
Please visit our conference web page to learn more and download the draft agenda. We hope to see you there! If you have questions, please contact Ali Furmall, office: 509-329-3436, cell: 509-655-0538.

Thursday, April 11, 2019

Tacoma Smelter Plume Yard Program

Work on Vashon-Maury Island moves ahead

If you live in the North end of Tacoma or the southern tip of Vashon-Maury Island, you have likely heard about the Tacoma Smelter Plume. However, if you just moved here, the following information may be new.

The smelter and stack are located on a hill. Water is in the foreground.
The former ASARCO smelter stack.

For nearly 100 years a smelter operated in the small town of Ruston. Air emissions from the smelter were carried by the wind to areas in King, Pierce and Thurston County. These air emissions contained heavy metals including arsenic and lead, which settled on surface soils. The highest levels of soil contamination are seen closest to the former smelter and decrease with distance.
 

Soil replacement work

Through our Residential Yard Sampling and Cleanup Program, we are working on 14 yards and a community-park in the southern end of Vashon-Maury Island. Work started on the first yard in early March 2019.

If you live in this neighborhood, you will likely see construction-related traffic. You may notice orange fencing, closed sidewalks, and Ecology’s Yard Program banner. The contractor usually works on a few yards at a time, which means workers may travel between yards with equipment. Construction can be noisy, and it is important to pay attention to trucks and large machinery that are coming and going. This construction will likely go through July 2019.    

Please call us if you see:
  • Dust in the air from construction.
  • Soil on the sidewalk or street.
  • Mud or water running off the property.
  • Dump trucks without covers.
 
Soil sampling
If you live on the southern end of Vashon-Maury Island it is likely that your property has already been sampled. To find out if your property has soil sampling results, go to our public database and enter your address. Soil sampling is for existing, residential properties. If you are a new homeowner, and your soil hasn’t been sampled, you can fill out an access agreement and get your yard sampled, too. Soil sampling is free and completely voluntary.

Future soil replacement

Currently, 53 properties qualify for soil replacement on Vashon-Maury Island. By the end of 2019, we will have removed and replaced soil on 35 of these properties. Unfortunately, we are not able to remove and replace soil on all the properties that qualify. Some properties have steep slopes or are located in areas we don’t work, like forests or vacant lots. And, sometimes, we are unable to coordinate with the property owner. At the end of the program, we will offer one last opportunity for residents with qualifying properties to participate in our Yard Program.
 

Blue and green dots mark the 14 properties receiving soil replacement in the southern end of Vashon-Maury Island.
By the end of 2019, we will have removed and
replaced soil on 35 properties on Vashon-Maury
Island.

Soil left behind

The main objective of the Tacoma Smelter Plume project is to reduce human health risks from arsenic and lead in soils. Soil replacement is focused on the high-use areas around homes and in areas where children play. Soil contamination may remain in undeveloped and forested areas. It is important to practice healthy actions like taking shoes off at the door and washing hands after working or playing in the dirt no matter where you live within the Tacoma Smelter Plume.
 

Questions

If you have any questions about the Yard Program or construction in your neighborhood, please call our project line 360-407-7688 x 2. We are always available for questions and are happy to help you find the information you need. 

Follow our yard cleanup work:

By Crescent Calimpong, Toxics Cleanup Program
 
Historical photo of the ASARCO smelter, courtesy of the Tacoma Public Library Northwest Digital Collections for historical photos.
 

Friday, January 11, 2019

2019 Washington State Brownfields Conference

Join us for the Washington State Brownfields Conference in Spokane this coming May. Brownfields are abandoned or underused properties where there may be environmental contamination. Cleaning up and redeveloping brownfields is key to local economic development efforts, turning perceived problems into community assets, such as affordable housing.

The goal of this conference is to bring together public and private sector stakeholders in Washington and the Inland Northwest to share information on brownfields redevelopment successes and future opportunities.

Save the Date postcard for the Washington State Brownfields ConferenceConference dates and location

Wednesday, May 29, 2019, 12 – 5 p.m.
Thursday, May 30, 2019, 8 a.m. – 5 p.m.
Doubletree by Hilton Spokane City Center
322 North Spokane Falls Court, Spokane

Registration information and the agenda will be available February 2019 on our Brownfields Conference web page.

What the conference will include:

  • Sessions on current technical issues, funding sources, and affordable housing opportunities
  • Case studies
  • Field trips to tour successful brownfield redevelopment projects in Spokane
  • Lunch and light refreshments on Day 1
  • Breakfast, lunch, and light refreshments on Day 2

Who should attend?

  • Local and regional government officials
  • Housing agencies
  • Nonprofit economic and community development organizations
  • Environmental consultants
  • Anyone interested in learning about brownfields or financial resources for local redevelopment

For more information, please contact:

Ali Furmall, Small and Rural Communities Brownfields Specialist
ali.furmall@ecy.wa.gov
509-329-3436, cell: 509-655-0538

Thursday, December 6, 2018

New Online Map: Dirt Alert

A hand holds a smart phone. The Dirt Alert map is displayed on the phone's screen.
The new map is mobile friendly, making it easy to access.
from your home computer or your phone.  

This month we launched a new online Dirt Alert map. The map focuses on the Tacoma Smelter Plume, but also covers areas in the state where soil contamination may exist from arsenic-related contamination: 

·        Everett Smelter cleanup


·        Five Washington counties where soil contamination may exist in former orchard lands
By putting both information and data in one place, we hope to make it easier for residents to find out about arsenic-related soil contamination and resources. The new web application replaces two older, online maps, the Arsenic in Soil Database and the Everett and Tacoma Smelter Search. 

New look- Same data
The upgrade means faster downloading times and the ability to access the map by phone. The map also visually displays soil sampling data. Within the Tacoma Smelter Plume and Everett Smelter cleanup area, the map provides access to:
·        Soil sampling maps

·        Soil replacement paperwork

For yards outside of the Everett Smelter cleanup area or Tacoma Smelter Plume Yard Program service area, the map links to our Healthy Actions webpage that teaches you how to protect yourself from arsenic and lead in dirt, and provides contacts for more information.

Questions?
If you have questions or comments about the map, please call the project line at 360-407-7688 and press 2 for Tacoma Smelter Plume. You can also email the Yard Program Outreach Coordinator at Crescent.Calimpong@ecy.wa.gov.

Get the latest updates:
·       Follow our blog!

·       Visit our webpage on the Tacoma Smelter Plume.

·       Sign up for email updates on our listserv.


A map of the Tacoma Smelter Plume, displaying predicted arsenic for the areas closest to the former smelter. The link to the dirt alert map is:  https://fortress.wa.gov/ecy/dirtalert/
The home page of Ecology's new, online map, Dirt Alert.
 
 
 
 
 
 
 
 



By Crescent Calimpong, Toxics Cleanup Program

Monday, September 10, 2018

Learn tips to beautify brownfields at 9/18 Yakima Workshop

Join Ecology and other experts as we dive deep into best practices and the latest trends in brownfield redevelopment, and provide you with tools and insights to advance your land reuse projects.

You can learn more about Ecology's brownfields program on our website.

What will I learn?

The workshop will kick off with a regulatory overview, covering topics from the economics of brownfield reuse, to uses of vacant and underutilized land and buildings, as well as issues unique to agricultural land. Presenters will share successful case studies from Wenatchee and Kittitas County. Ecology and the Washington Department of Commerce will talk about tools and grants to get moving on your brownfields sites.

See the agenda and speakers here.

Other topics include:
  • Grants: State and Federal
  • Due Diligence and Your Responsibility
  • Working with Private Property Owners
  • Redeveloping Agricultural Areas and Town Centers
  • Public, Private, Non-Profit, Community: How Can You Help?
  • Ask the Expert

Who should attend?

  • Project Managers (public, private, and nonprofit)
  • City Planners
  • Construction Managers
  • Redevelopment Managers
  • Environmental Attorneys
  • Practitioners engaged in the acquisition, funding, and development of properties

Register today!

The Brownfields Workshop is Tuesday, Sept. 18, 10 a.m. - 3:30 p.m. at the Yakima Convention Center.

Thursday, July 5, 2018

Cleaning up: Taking it to the streets in Everett


Contractors install new curbs and gutters on Everett's East
Marine View Drive, near State Route 529. Clean fill now
replaces contaminated soil that was under the street.
UPDATE (Dec. 3, 2018):
We’re almost done on East Marine View Drive! All lanes should be open the week before Christmas at the latest.

Final checks of restored connections to temporarily relocated utilities are under way. Then we’ll add the top layer of pavement, traffic signals and other finishing touches.

The paving layer and markings may be temporary, due to cool weather. If needed, we’ll return in the spring to install permanent paving and markings. 

By late January 2019 we’ll start cleanup work at Wiggums Hollow Park, closing part of it. We expect that project to wrap up late this spring. We’ll begin the cleanup – and temporary closure – of Viola Oursler Overlook as soon as March 2019.

We appreciate everyone’s patience with these projects! 


We’re about to tie up a major intersection in Everett. We hope you’ll use the posted detours while we dig out contaminated soil that’s under East Marine View Drive at the intersection with Riverside Road – and part of the interchange with SR529/North Broadway.
  
A pair of maps illustrate how the area where East Marine View Drive meets North Broadway was part of the Everett Smelter.
We're working where part of the Everett Smelter once stood.
It’s a spot where part of a smelter that produced lead and arsenic once stood. Removing soil and rubble from demolished buildings – to a depth of about 18 feet – will clean out sources of lead and arsenic contamination in groundwater that flows to the Snohomish River.

The Everett Smelter operated from 1894-1912, but the contamination wasn't discovered until 1990. Smelter operations left high levels of arsenic and lead on the former smelter property. Contaminated particles from the smokestacks settled over a 1.1 square mile area.

Cleanup of other parts of the smelter property took place in 2005-2007, but the part under the street has been left in place. Until now, that is.

Later this month our contractors will start about three to four months of work. They’ll dig out an expected 4,300 cubic yards of soil and rubble, haul it to a licensed disposal site, and replace it with clean soil. Dust control is a high priority on this project, and crews will use water sprays during the excavation.

Diagrams on an aerial photo map show that through traffic and turns will be restricted during a cleanup excavation that will block part of East Marine View Drive.
Before you go: An alternate route may be your best bet.
Arrows show where traffic can go in each work phase.
Do a good turn: plan before your trip
To do all this we’ll need to close off parts of East Marine View Drive, one side at a time. It will take six to eight weeks for each of the project’s two phases.

We’ve tried to allow as much traffic flow as possible, but we’ll have to block some lanes and turn directions. We’re maintaining access to and from Riverside Road throughout the project.

The pictures to the right paint the thousand words it might take to explain it all. See the latest details in an update to information we mailed in June to addresses within a mile of the project.

Posted detour routes may add a few blocks to your travels, but let you avoid our temporary bottleneck.

Our contractor will have flaggers to direct traffic past the work area. As with any other road construction project, please slow down as you approach and pass through the site.

Yard cleanups continue
Meanwhile, we’re still cleaning residential yards contaminated by smelter operations. We completed 11 yard cleanups over the winter – bringing the total to 395 – and are preparing to start working with 20 more this summer.

Fresh topsoil has been spread in a backyard. Tractor tread tracks criss cross the newly spread soil.
A recent yard cleanup in progress: Clean topsoil is 
shaped into place, prior to re-landscaping.
We’re offering soil sampling at any yard we haven’t previously sampled in the 170-acre Everett Smelter plume cleanup site in northeastern Everett.

We work with property owners in this area on a voluntary basis. We start with soil testing and when needed, we offer to remove contaminated dirt and bring in clean soil to restore the yard.

If you live within the cleanup site and your yard has not had its cleanup, please continue to follow healthy actions that include washing hands with soap, leaving shoes at the door, regular floor and carpet cleaning, and frequent washing of children’s toys and pacifiers.

Park cleanups coming
Like yards, parks in the cleanup area can need cleanup, too. In 2016, we completed the cleanup of American Legion Memorial Park, the first of three parks where we're replacing soil in the cleanup area.

We’re planning such work after Labor Day at Wiggums Hollow Park and Viola Oursler Overlook. Both parks will close during these cleanups. We should be done, including establishing new lawns, in early 2019.



 By: Larry Altose, communications manager, Northwest Regional Office


Links: