Work on Vashon-Maury Island moves ahead
If you live
in the North end of Tacoma or the southern tip of Vashon-Maury Island, you have
likely heard about the Tacoma Smelter Plume.
However, if you just moved here, the following information may be new.
The former ASARCO smelter stack. |
For
nearly 100 years a smelter operated in the small town of Ruston. Air emissions
from the smelter were carried by the wind to areas in King, Pierce and Thurston
County. These air emissions contained heavy metals including arsenic and lead,
which settled on surface soils. The highest levels of soil contamination are
seen closest to the former smelter and decrease with distance.
Soil replacement work
Through
our Residential Yard Sampling and Cleanup Program, we are working on 14 yards and a community-park
in the southern end of Vashon-Maury Island. Work started on the first yard in
early March 2019.
If you
live in this neighborhood, you will likely see construction-related traffic. You
may notice orange fencing, closed sidewalks, and Ecology’s Yard Program banner. The
contractor usually works on a few yards at a time, which means workers may
travel between yards with equipment. Construction can be noisy, and it is
important to pay attention to trucks and large machinery that are coming and
going. This construction will likely go through July 2019.
Please call us if you see:
Please call us if you see:
- Dust in the air from construction.
- Soil on the sidewalk or street.
- Mud or water running off the property.
- Dump trucks without covers.
Soil sampling
If you
live on the southern end of Vashon-Maury Island it is likely that your property
has already been sampled. To find out if your property has soil sampling
results, go to our public database and
enter your address. Soil sampling is for existing, residential properties. If
you are a new homeowner, and your soil hasn’t been sampled, you can fill out an
access agreement and get your yard sampled, too. Soil sampling is free and
completely voluntary.
Future soil replacement
Currently, 53 properties qualify for soil replacement on Vashon-Maury Island. By the end of 2019, we will have removed and replaced soil on 35 of these properties. Unfortunately, we are not able to remove and replace soil on all the properties that qualify. Some properties have steep slopes or are located in areas we don’t work, like forests or vacant lots. And, sometimes, we are unable to coordinate with the property owner. At the end of the program, we will offer one last opportunity for residents with qualifying properties to participate in our Yard Program.
By the end of 2019, we will have removed and
replaced soil on 35 properties on Vashon-Maury
Island.
|
Soil left behind
The
main objective of the Tacoma Smelter Plume project is to reduce human health
risks from arsenic and lead in soils. Soil replacement is focused on the
high-use areas around homes and in areas where children play. Soil
contamination may remain in undeveloped and forested areas. It is important to
practice healthy actions like
taking shoes off at the door and washing hands after working or playing in the
dirt no matter where you live within the Tacoma Smelter Plume.
Questions
If you have any questions about the Yard Program or
construction in your neighborhood, please call our project line 360-407-7688
x 2. We are always available for questions and are happy to help you
find the information you need.
Follow our yard cleanup work:
- Follow our blog!
- Visit our webpage on the Tacoma Smelter Plume.
- Sign up for email updates on our listserv.
- Look up soil sampling or soil replacement records on our public database.
By Crescent Calimpong, Toxics Cleanup Program
Historical photo of the ASARCO smelter, courtesy of the Tacoma Public Library Northwest Digital Collections for historical photos.
No comments:
Post a Comment
We will not post comments with links to commercial sites, so please do not include them! Thank you.
(Comments Policy)